Company News

When you hand a board design to a supplier, how do your quality requirements carry over from bare board fabrication to final assembly? If your final assembly deadline is already set, how do you fit PCB manufacturing, component sourcing, and PCB assembly into one clear schedule?
From November 10 to 13th, the KnownPCB team attended electronica 2026 in Munich, Germany. At Booth A2.477/8, we met with visiting buyers, engineers, and industry partners. We talked about bare PCB manufacturing, turnkey PCB assembly, quality control, and project lead times.
For sourcing teams evaluating suppliers, it all comes down to one key question: Can your manufacturer carry your project requirements all the way from Gerber files to final delivery?

In Munich, we introduced visitors to KnownPCB's end-to-end PCB fabrication and PCB assembly services. Looking at both stages together makes it easier to clarify critical technical details. For instance, engineers focus on whether the bare board can be manufactured according to their spec. Meanwhile, the assembly team needs to plan for component packaging, post-soldering inspection, and your incoming quality standards.
Take BGA components as an example. Their solder joints are hidden beneath the chip. If you need to verify these hidden joints before shipment, KnownPCB can evaluate your specific part numbers and arrange X-ray inspection. We also provide actual X-ray images upon request. For complex parts where imaging clarity might be limited, we will confirm with you in advance on what can be visualized and whether it meets your inspection standards.
When comparing PCB/PCBA suppliers, buyers should ask specific questions. Instead of just asking, "Do you have an X-ray machine?" ask: "For my specific board, which joints can you inspect, and what quality records can I receive?" That's truly meaningful for your project's success.
Project lead times were another major topic at our booth.
When a buyer says, "We need boards by the end of the month," it can mean two very different things. You might need bare PCBs delivered to your own assembly house. Or, you might need fully assembled PCBA prototypes ready for verification. Those two requests sound similar, yet they involve very different workflows.
If you are quoting a PCB and assembly project, it's better to share clear details during your first inquiry. For example, you might say: "We need 20 fully assembled PCBAs delivered by [Date] for system-level verification, and we will handle functional testing in-house."
With your target quantity, assembly status, and delivery date in hand, we can map out the timeline together. We will arrange exact schedules for bare PCB fabrication, component procurement, assembly inspection, and shipping. This helps identify potential bottlenecks before production even starts.
Thank you to all the familiar faces and new partners who stopped by the KnownPCB booth in Munich. These face-to-face conversations remind us that behind every RFQ is a real-world deadline—whether it is an upcoming prototype validation or a scheduled production run. Understanding the context early is just as important as the technical specs.

If we chatted at Booth A2.477/8, feel free to send over the board specs, quantities, or open questions we discussed. We are ready to pick up right where we left off.
Planning a new PCB or PCBA project?
Send us your Gerber files, BOM, and target delivery date. Our engineering team will review your files and provide a tailored evaluation.